Industrial site assessment

Bien-Air Dental chart

Objectives

Gain a clear picture of the current state to identify the root causes of production lead times and WIP values, and simulate potential solutions (“what-if” scenarios).

Simulations performed

  1. Current state (11/01/2013 to 10/30/2014).

  2. Batch size reduction: 14-day threshold in manufacturing, 7 days in assembly.

  3. Transfer batch size reduction: overlapping for all batches.

  4. Increase operating hours for the 8 critical workstations and 12 key workstations.

  5. Staffing increase of 3 operators in turning and grinding.

Results

The CashInFlux model reveals significant improvement opportunities within Bien-Air's production system:

  • WIP reduced by more than 25%,

  • Lead times cut by more than 50%,

  • Queues cut in half at critical workstations,

  • Improved overall responsiveness on the longest lead times.

Notes:  Reducing release batch sizes primarily impacts machining lead times and WIP values.
Reducing transfer batch sizes has a striking effect on assembly cycles.
Increasing operating hours significantly reduces queues at critical workstations without driving up setup workloads.
Increasing headcount has a low, or even negligible, impact.

The company's logistics manager was impressed by the tool's contributions: “CashInFlux allows us to see that the paths we thought were fruitful indeed are, but to achieve substantial gains, we need to combine these paths into a new production model and, above all, apply differentiated solutions to manufacturing and assembly.”