Industrial site assessment
Objectives
Gain a clear picture of the current state to identify the root causes of production lead times and WIP values, and simulate potential solutions (“what-if” scenarios).
Simulations performed
Current state (11/01/2013 to 10/30/2014).
Batch size reduction: 14-day threshold in manufacturing, 7 days in assembly.
Transfer batch size reduction: overlapping for all batches.
Increase operating hours for the 8 critical workstations and 12 key workstations.
Staffing increase of 3 operators in turning and grinding.
Results
The CashInFlux model reveals significant improvement opportunities within Bien-Air's production system:
WIP reduced by more than 25%,
Lead times cut by more than 50%,
Queues cut in half at critical workstations,
Improved overall responsiveness on the longest lead times.
Notes: Reducing release batch sizes primarily impacts machining lead times and WIP values.
Reducing transfer batch sizes has a striking effect on assembly cycles.
Increasing operating hours significantly reduces queues at critical workstations without driving up setup workloads.
Increasing headcount has a low, or even negligible, impact.
The company's logistics manager was impressed by the tool's contributions: “CashInFlux allows us to see that the paths we thought were fruitful indeed are, but to achieve substantial gains, we need to combine these paths into a new production model and, above all, apply differentiated solutions to manufacturing and assembly.”