Industrial site assessment

Groupe SEB table

Objectives

  • In the context of a "Best-in-class" site, identify additional potential with a disruptive methodology and tool

  • Quantify this potential to sustain the site in France

  • Serve as a pilot case for the Group to drive continuous progress

Services were delivered in 2 phases

2014 baseline calibration and diagnosis:

  • Collection of MRP technical data: Routings including standard times, bills of materials, purchase delivery batch sizes and manufacturing lot sizes, resource calendars and yields, etc. Data fine-tuning until matching the known current state...

  • Diagnosis: VA/NVA, fixed overhead absorption, labor under-utilization, material flows (lead times, inventory, floor space), etc.

Costing of solution avenues:

  • Upstream of the site: Diagnosis of "Product/Process" pairs, assessment of resourcing opportunities in Europe vs. China, reduction of storage floor space in external platforms, activity increase to better absorb fixed overheads

  • On-site: Labor productivity improvement project, lot size optimization to reduce production WIP and associated storage floor space, assessment of layout and tugger train routing

Results

  • A list of identified opportunities that the manual approach could no longer detect

  • Concrete solutions with an already quantified impact of €125k, with further potential to develop across the identified areas

  • Feedback from the Head of OPS (Operation Performance SEB): "Exhaustive techno-economic overview, delivering operational performance safely, with resource efficiency to achieve targeted results, all in under 20 days!"